Building Construction Designer

Product by Abdulaziz Hussein

Floor Plan → Structural Elements → Construction Quantities → BOQ → Cost Estimate → Final Report

🏠🏗️
Project
Floor Area0.00 m²
Concrete0.00 m³
BOQ Total0.00 ETB

Workflow

Automatic sequence

Quick Actions

PLAN + GEOMETRY

3D Building Plan + CAD

Building Geometry

Openings

Structural Inputs

Live 3D Building Model

Linked to the CAD plan
CAD-STYLE DESIGNER

Interactive 2D Floor Plan + Linked 3D Building Designer

Draw, select, move, delete. Grid/snap are in cm. Wall thickness follows the input above. Room names can be entered when drawn.

Drawing Objects

Select a tool and click the drawing.
CAD takeoff will appear here.

V9: geometry-aware CAD tools, undo/redo, zoom/pan, saved drawings, wall thickness, room labels and automatic CAD takeoff are linked to the live 3D model. This is a preliminary design/takeoff tool; final structural drawings require professional review.

Material Estimation Assumptions

Enter dimensions and calculate.
FOUNDATION / BELOW GROUND

Sub Structure

Sub Structure Components

User-entered dimensions • automatic quantity takeoff

Quantity Summary

Sub-structure takeoff

Material Estimate

Concrete + stone
Enter dimensions and calculate.

Sub Structure Scope

1. Excavation SUB-001
2. Blinding Concrete SUB-002
3. Footing Concrete SUB-003
4. Foundation Wall / Stone SUB-004
5. DPC SUB-005
6. Backfilling SUB-006
ABOVE GROUND STRUCTURE

Super Structure

Columns

Columns

STR-002
0.00 m³
Beams

Beams

STR-003
0.00 m³
Slab

Slab

SLB-001
0.00 m³
Staircase

Staircase

STR-004
0.00 m³
Wall Masonry

Wall Masonry

MAS-003
0 pcs
Roof

Roof

ROOF-001
0.00 m³

Super Structure Summary

Automatic quantities

Concrete Material Estimate

Dry factor 1.54
Calculate to see material quantities.
AUTO WORK CODES

Construction Workflow

Auto Work CodeCNS-000

Select a work section

Choose a construction section.
PRELIMINARY ESTIMATE

Rebar

Rebar Estimate

0.00 kg

Preliminary estimating allowance only. Final reinforcement must follow approved structural drawings and qualified structural engineering design.

AUTOMATIC TAKEOFF

Materials

Detailed Material Takeoff

From building geometry and structural inputs
BILL OF QUANTITIES

BOQ

Grand Total: 0.00 ETB
PROJECT MONITORING

Progress / Reports

Progress

Site Clearing
Foundation
Structure
Masonry
Finishing
Overall: 0%